npm node-red-contrib-power-saver 6.0.0
Bug-fixes and dependency updates

3 hours ago
  • Update dependencies.
  • Remove some dependencies.
  • Requires node version >= 22.9.0, hence the major version change.
  • Update search tags in doc.
  • Fix bug in strategy-functions: guard the handleStrategyInput result instead of
    destructuring it, so a payload-less or command-only message before any
    price data no longer crashes every strategy node.
  • Fix bug in schedule-merger: compare the period a schedule covers instead of its last
    collapsed entry, so saving a second strategy's schedule stops deleting the
    first one.
  • Fix bug in schedule-merger: look every source up at each switch point instead of
    transposing on timestamp keys, so a source covering a longer run can no
    longer drop out of the OR/AND merge.
  • Fix bug in strategy-lowest-price: seed the running minimum with Infinity, not the sum
    of all values, so negative prices no longer make it pick the most
    expensive slot.
  • Fix bug in utils: addEndToLast no longer reads index -1 for a single price record.
  • Fix bug in handle-input: infer the last record's missing end instead of dereferencing
    the next record, and plan the final period rather than dropping it.
  • Fix bug in general-add-tariff: call substring on p.start, not on the period object,
    so tariff periods with HH:MM starts work.
  • Fix bug in heat-capacitor: findTemp accepts the ISO string it is given from
    msg.payload.time, which previously compared as NaN and always returned the
    last schedule entry.
  • Fix bug in light-saver: rebuild the event bus subscriptions when the entities in the
    config change, and unsubscribe from what was actually subscribed, so
    dynamic config takes effect and no listeners leak across redeploys.
  • Fix bug in light-saver: skip only the timeout check when a trigger is on, not the
    whole function, so the documented Immediate level still applies.
  • Fix bug in handle-output: wait in chunks above the 32 bit setTimeout limit, instead
    of switching immediately for anything more than ~24.8 days ahead.
  • Fix bug in schedule-merger: optional chaining on the msg.payload reads, and return an
    empty schedule from makeScheduleFromMinutes when there is nothing to merge.
  • Fix bug in strategy-fixed-schedule: fall back to outputIfNoSchedule when periods is
    empty, instead of dereferencing undefined for every hour.
  • Fix bug in handle-input: malformed priceData was warned about but accepted anyway,
    because the check returned from inside a forEach callback. Such a message is now
    rejected. Prices given as strings are still accepted, and are converted to
    numbers before planning. Thanks to @anupamme for reporting it.

Don't miss a new node-red-contrib-power-saver release

NewReleases is sending notifications on new releases.