2.22.0 (2026-11-23)
Features
- preview where a moved event lands in month and multi-week views (#193) (69bd327)
- time-grid: add
multiDayTimedEventPlacement="all-day"to place 24-hour and longer timed events in the all-day lane (defaults to"grid") (#197) (80f5db0) - time-grid: drag all-day events across days. Behaviour change on native: when
onDragEventis set, a long press on a movable all-day bar starts a drag instead of callingonLongPressEvent(matching timed and month events; setdraggable: false,startEditable: false, oreventStartEditable={false}to keep a bar static). (#194) (091ad94) - time-grid: square the continuing ends of all-day bars (#190) (1404d2b)
Bug Fixes
- keep the month create draft on the top lane from the first day of the sweep. Headless API note:
MonthRowLanesis now deprecated and the fourth argument tokeepMonthDraftVisibleis optional and ignored (kept for compatibility). (#192) (cccbe70) - let a timed-event drag cross midnight upwards into the previous day (#191) (1c77df0)