github wrongisthenewright/ebusd-configuration-ariston-bridgenet v2.6

4 days ago

What's Changed

  • Added further Boiler counters (operating hours, flame lifts)
  • Added Boiler gas PWM modulation and Pump PWM modulation
  • Added HP/Hybrid counters (hours spent on heating, cooling, defrost, boiler and hp combined heating, dhw buffer heating, number of HP cycles)
  • Added estimated costs for Boiler and HP
  • Added Boiler current output energy in kW (solves #20)

Note: to calculate Gas consumption the Boiler output in kw must be divided by the conversion ratio between a m3 of gas and kW (for natgas/methane is around 11), it must be done outside eBusd (eg. via HA template)