ZenNotes 2.94.0 lets a task say which day you will work on it without moving its deadline, and lets you choose how far Indent sections moves each heading in. Tasks with a block id now stay linked when you date them, and the Tasks calendar's month keys work again.
Released from bba68f21 through #1121 on 2026-11-28.
Features
- Plan a task for a day without moving its due date (#1119). A due date is a deadline, and the only way to say "I will do this on Wednesday" used to be moving that deadline, which made the task late on the wrong day and moved its reminder. A task can now carry a planned day as well:
- Write it as
@scheduled:besidedue:, for example- [ ] Send the report due:2026-12-04 @scheduled:2026-12-02. A task note keeps it in frontmatter asscheduled:. - The task shows on its planned day in the Tasks list, the board, both calendars and the Timeline, with a small calendar mark, and its due date beside it as a flag.
- It only turns late when its due date passes. A planned day that goes by with the task still open is not overdue: the task waits under Today in the normal color, and nothing is written to the note. Reminders still count from the due date.
- Plan a task from its right-click menu (Plan for…), with
pin Vim mode to plan it for today (in the Tasks list, the board and the calendars), with:plan today,:plan 2026-12-02or:plan offin a note, or by typing@scheduled:and picking a day. Dropping a task on a calendar day offers Plan for that day beside moving it and setting its due date. - On the board's Status columns a task with a planned day moves by its plan, so a drop on Today plans it for today and leaves its due date alone.
- Checking off a repeating task drops the planned day from both lines, since it belonged to that occurrence. For a task in a daily note, a planned day replaces the note's date as the day the task is on.
- Tasks imported from Logseq with both a SCHEDULED and a DEADLINE date already have both.
- Write it as
- Indent width for Indent sections (from a request by Dave on Discord). Settings, Typography, Headings, Indent width sets how many spaces each heading level moves in while Indent sections is on, from 1 to 8 (3 by default). A space is the same column Tab size and nested lists count in, so 4 lines a section up with a list nested at Tab size 4. In Vim mode,
:indentsections 4sets it and turns Indent sections on. It applies in the editor, Preview, the floating note window, Quick Capture and PDF export, and travels inconfig.tomlassection_indent_widthunder[typography].
Fixes
- A task's block id stays linked when it gets a date, a priority or a tag. A task line can end in a block id,
- [ ] Call Sam ^call, so[[Plan^call]]and![[Plan^call]]point at it. Setting a due date, a priority,@waitingor a first tag on such a task (from the board, the right-click menu, the pickers or the MCP server) wrote the new token after the id:- [ ] Call Sam ^call due:2026-12-02. The id then no longer ended its line, the link stopped finding it, and^callshowed up in the task's text. The token now goes in front of it,- [ ] Call Sam due:2026-12-02 ^call, and so does the link a forwarded task gains. A line already written the wrong way is put right the next time its due date is set. This had been so since block ids came in 2.87. [and]change the month on the Tasks calendar again. In Vim mode they were taken as the start of the buffer keys[band]bbefore the calendar saw them, so the month never moved. They now reach the calendar while it has the keyboard;[b,]bandgtwork as before everywhere else.- An edit at the very start of a note highlights like a fresh open. With the newer editor packages, typing or breaking the frontmatter's closing fence, or deleting at the first character of a note without frontmatter, could leave the note highlighted as it read before the edit: an indented code block stayed one after losing part of its indent. Those edits now parse the note's body afresh.
Command line
- The desktop bundles zn 0.19.1. 0.19.0 brought a Tasks board that fits a narrow terminal (hide empty columns, wrapped card titles, card fields) and frontmatter that folds to one row in the preview (#1122). 0.19.1 carries the block id fix above into
zn tuiandzn mcp, and drops a repeating task's planned day the same way the desktop does.
Phones
- The iPhone and Android apps bring this core: the planned day in Tasks and both calendars, Indent width in Settings, Typography, and the block id fix.
For contributors
- The planned day's rule lives in
packages/shared-domain/src/task-planning.ts:plannedDay,taskDeadline(the only date lateness reads) andtaskDay(the one day every surface places a task on).tasksDueOnandbucketTasksByDueDatebecametasksOnDayandbucketTasksByDayand take today. - Every writer that grows a task line goes through
appendTaskTokeninpackages/shared-domain/src/tasklists.ts, which keeps a trailing^idlast. zn's copy (internal/vault/tasks.go) mirrors it. - Dependencies: the CodeMirror and Lezer packages and other libraries the phone apps already ship, electron-builder 26.18.0 without the local patch, and GitHub Actions on their current majors (#1063). Dependabot now leaves major versions to be taken by hand, so its weekly pull requests stay mergeable.
Demos
- planned-day.mp4: a task due Wednesday planned for today with
p, then the calendar with each task on its planned day. - indent-width.mp4:
:indentsections 6and:indentsections 2, then the Indent width row in Settings. - block-id.mp4: a task embedded by its block id gets a due date on the board and stays embedded; then
]][on the Tasks calendar.
Verification
How to test locally:
- Write
- [ ] Send the report due:with a date next week, open Tasks and, with Vim mode on, select it and pressp. It moves to Today with a calendar mark, still shows its due date as a flag, and the note now reads@scheduled:with today's date besidedue:. - Right-click it and choose Plan for…, pick another day: it moves to that day in the calendar. Its due date does not change.
- Turn on Indent sections and open a note with nested headings. Run
:indentsections 6, then:indentsections 2. Each level moves in by that many spaces. Settings, Typography, Headings shows the same value under Indent width. - Put
- [ ] Call Sam ^callin a note named Plan and![[Plan^call]]in another. On the Tasks board move Call Sam to Today. Before: the line read- [ ] Call Sam ^call due:…and the embed said "Embedded block not found". After:- [ ] Call Sam due:… ^call, and the embed shows the task. - Switch Tasks to Calendar with Vim mode on and press
], then[. Before: the month stayed put. After: next month, then back.
Distribution channels
PLACEHOLDER
Release validation
PLACEHOLDER