v5.39.0 — three UX wins + per-phase install retry
A mixed-scope minor following v5.38.0's multi-distro work. Targeted bugs and polish across the live issue backlog rather than continuing a single workstream.
Auto-hide unused bottom-nav tabs (#160)
The six fixed-width tabs used to overflow on smaller-aspect devices like the Samsung S22 (thanks rkxspace for the screenshot). Now each tab fades in only when its category has data:
- Terminal appears when you add an SSH / Mosh / ET / Reticulum profile.
- Keys appears when you add an SSH key or step-ca config (still reachable from Settings either way).
- Desktop unchanged from v5.38 — already conditional on having a VNC / RDP / Wayland / local-shell session.
- Connections / Sftp / Settings always shown.
Settings gains an "Always show all tabs" toggle as the safety net for power users who prefer the old layout.
Selection autoscroll velocity scaling (#94)
When dragging a selection past the top or bottom of the visible terminal, the scroll rate now ramps with finger position:
- 1 row/tick at the inner edge of the trigger zone (matches the old fixed rate).
- 8 rows/tick (≈130 rows/sec) at the very screen edge.
- Linear ramp between.
Selecting through long output is noticeably faster. Thanks ehoeve786 for the feedback.
Per-phase install retry (#162 Phase 3d)
The error chip on a failed proot rootfs install now sits next to a Retry button:
- Bootstrap-hook or Baseline failure → re-runs just that phase against the existing rootfs. Hooks are documented idempotent via
RootfsHook.idempotent = true. - Download or Extract failure → "Wipe & retry" starts over from the tarball, because partial-extract state is the risk being recovered from.
No more delete-and-reinstall-the-whole-rootfs to recover from a transient mirror flake.
Confirmed fixed
- #133 step-ca OIDC discovery URL normalisation (Authentik issuer-URL
configurationEndpointno longer 404s) — already shipped in v5.38.0, comment confirmed.
Deferred to v5.40
- #164 Mosh-over-WireGuard tunnel. Root cause identified (Haven's
TunnelResolveris TCP-only; Mosh's UDP socket bypasses the tunnel). Fix requires adding a UDP surface to the tunnel manager and refactoringMoshConnectionto take a socket provider — bigger than v5.39 had room for. - #162 Phase 4 — nested wlroots compositors (Sway / Hyprland / niri via headless wlroots +
wayvnc). 2–3 weeks of focused work, going to v5.40.
What hasn't changed
The v5.38.0 multi-distro work, the MCP foreground-service binding, the Room-backed install log, the 8 MCP tools, and the Desktop tab consolidation all carry forward unchanged.